Safety information

See also:

How long is the arbitration process?
The entire process — from the time NCDS receives your request for arbitration to the arbitrator’s decision — is designed to take no more than 40 days. A decision may be delayed if: • You ...

Type B: function achieved by using DCM and the Navigation system
Of the functions included with Lexus Enform with Safety Connect, Destination Assist, eDestination, and Lexus Insider can be achieved by making DCM cooperate with the navigation system. These ar ...

Mooroof
Use the overhead switches to open, close, and tilt the moon roof up and down. - Opening and closing 1 Open Stops just before it is opened fully. Press the switch again to fully open. 2 Cl ...